Integhra.com
+31203690330

Russian Federation, Khabarovsk

Russian Federation, Khabarovsk
Within the frameworks of this project the company performed “turn-key” operations, beginning from the pre-project examination and development of the project documentation, and ending by supply of assembled cabinets and stage of introduction. All wishes of the Customer were considered at the stage of development of the project documentation and at the stage of commissioning works. Thus, PCS of CDU/VDU considers all peculiarities of the technological process and is very convenient for operation by operating and maintenance personnel.

ICS was constructed on the basis of reserve controller equipment FCP270 (I/A Series) and remote input/output, produced by Invensys. In this project, modern technical means and software products in compliance with all requirements presented to PCS in the oil and gas field were used. “High” level of control includes 8 workspaces for operators and 1 workspace for PCS engineer. Apart from this, LCD panel, where all general parameters are presented, is provided for the convenience of signal perception. The designed PCS was created with sufficient reserve of input/output channels that allows, if necessary, to connect signals from the newly installed equipment to it in future.

Back