Complex of operations for the block-modular pump station of carbon dioxide corrosion inhibitor injection with underground vessels of the South-Kirinsky gas-condensate pool.
Installation of fire protection system alarm, installation of telecommunication and computer network, installation of video control system, installation of dry chemical fire suppression system of the oil refinery.
Enlargement of PCS of crude vacuum unit of oil refinery. Technical re-equipment of the vacuum block of the unit - crude vacuum unit. Reconstruction of production scheme of motor petrol.
PCS of the pump station of household and drinking and production fire safety purpose. Project development, equipment supply, contract supervision, commissioning works
Installation of equipment of medical gases, their central distribution, installation of fire and security system alarm, access control, video monitoring systems, telecommunication and computer networks